Last edited by Mezijinn
Wednesday, August 5, 2020 | History

3 edition of LIRR abused the change order process during construction of the Holban/Hillside Maintenance Facility found in the catalog.

LIRR abused the change order process during construction of the Holban/Hillside Maintenance Facility

New York (State). Dept. of Audit and Control. Division of Management Audit.

LIRR abused the change order process during construction of the Holban/Hillside Maintenance Facility

by New York (State). Dept. of Audit and Control. Division of Management Audit.

  • 237 Want to read
  • 31 Currently reading

Published by The Division in [Albany, N.Y .
Written in English

    Subjects:
  • Long Island Railroad Company -- Auditing.,
  • Public contracts -- New York (State) -- Auditing.

  • Edition Notes

    Other titlesLong Island Railroad abused the change order process during construction of the Holban/Hillside maintenance facility
    StatementState of New York, Office of the State Comptroller, Division of Management Audit.
    SeriesReport / State of New York, Office of the State Comptroller, Division of Management Audit -- 90-S-19, Report (New York (State). Dept. of Audit and Control. Division of Management Audit) -- 90-S-19.
    The Physical Object
    FormatMicroform
    Pagination[2], 4 leaves, 18 p.
    Number of Pages18
    ID Numbers
    Open LibraryOL22208456M


Share this book
You might also like
Guidelines for water quality objectives and standards

Guidelines for water quality objectives and standards

Jenkinson story.

Jenkinson story.

NATIONAL SYNCHROTRON LIGHT SOURCE... ACTIVITY REPORT 2003... U.S. DEPARTMENT OF ENERGY

NATIONAL SYNCHROTRON LIGHT SOURCE... ACTIVITY REPORT 2003... U.S. DEPARTMENT OF ENERGY

Grace before meals

Grace before meals

Monks Hood

Monks Hood

Drug abuse control in Myanmar border areas project

Drug abuse control in Myanmar border areas project

English studies and history

English studies and history

A selection from the comedies of Marivaux

A selection from the comedies of Marivaux

Bhavya on Mīmāṃsā =

Bhavya on Mīmāṃsā =

Here Its Winter (Multicultural Sing-Along Big Book Program Series)

Here Its Winter (Multicultural Sing-Along Big Book Program Series)

Giant Pandas (Bears)

Giant Pandas (Bears)

Basel Convention on the Control of Transboundary Movements of Hazardous Wastes and Their Disposal

Basel Convention on the Control of Transboundary Movements of Hazardous Wastes and Their Disposal

Reborn

Reborn

Provence

Provence

Memorandum on the future of the BBC.

Memorandum on the future of the BBC.

Narcotics trafficking in Georgia

Narcotics trafficking in Georgia

Emilys house.

Emilys house.

LIRR abused the change order process during construction of the Holban/Hillside Maintenance Facility by New York (State). Dept. of Audit and Control. Division of Management Audit. Download PDF EPUB FB2